How To Show a Standard Cost Component on a Single Level

We use report S_P99_41000111 for displaying cost components for multiple materials. However we are looking for the cost component costs incurred on the material itself, and not from the lower level materials. For example, we have a finished product with a cost component called Freight. The value in this cost component is $20. However, $15 of this freight came from the source material in a different plant. We therefore only want $5 to show in this report.